Public Hearing: I-15 Environmental Reevaluation - Revision 1

This is a Notice Revision

You are currently viewing a revision of a notice. This is a previous copy of a notice that has been published more recently. To view the current version of this notice, click here.

Please Note: Only the files that were associated to this version are included in the Download Attachments section. If that section does not display, all attachments were removed from this version of the notice.

General Information

Government Type
State Agency
Entity
Utah Department of Transportation (UDOT)
Public Body
Department of Transportation

Notice Information

Notice Title
Public Hearing: I-15 Environmental Reevaluation
Notice Tags
Utah Department of Transportation, I-15, St George, Improvement
Notice Type(s)
Notice, Meeting
Event Start Date & Time
June 25, 2025 05:00 PM
Event End Date & Time
June 25, 2025 07:00 PM
Event Deadline Date & Time
07/07/25 04:00 PM
Description/Agenda
The Utah Department of Transportation (UDOT) has released a preliminary design and draft environmental reevaluation for the Interstate 15 St. George Boulevard to Bluff Street project that will be presented at a public meeting and open to public comment. UDOT is hosting a public meeting to present the findings of the reevaluation, provide an opportunity to submit written or verbal comments, display the preliminary design of the project, and answer questions from the public. In-person Public Hearing (open house format): Wednesday, June 25, from 5 to 7 p.m. Dixie Middle School, 929 S 100 E, St. George, Utah 84770. The in-person meeting is an open-house format with no formal presentation provided. Materials displayed at the meeting will be made available the next day at udotinput.utah.gov/I15stgeorge A public comment period is open from June 18 through July 7, 2025. The environmental document will be available at udotinput.utah.gov/I15stgeorge on June 18. Paper copies are available at the St. George City Library (88 W 100 S, St. George, UT), St. George City Office (175 E 200 N, St. George, UT), and UDOT Region 4 Office (5340 S 5300 W, Hurricane, UT 84737). Comments are accepted: In-person at the Public Hearing on June 25, via written comment form or a court reporter Online at udotinput.utah.gov/I15stgeorge By email to I15StGeorge@utah.gov By mail to the I-15 St. George Improved Project Team, c/o Avenue Consultants (136 E Riverside Drive, Suite 100, St. George, UT 84790) Comments must be submitted or postmarked by July 7, 2025. All comments submitted will be evaluated and considered by UDOT. The reevaluation of the I-15 South EA and the I-15 St. George Improved EA is being completed to incorporate the addition of the new overpasses and local connections at 400 East and 900 South that were not part of the original environmental documents. The reevaluation process began in fall 2024 and is scheduled for completion by summer 2025, with construction of the project planned to begin in summer 2026. Environmental documents are process-driven, so the schedule is approximate and subject to change. A new I-15 interchange at 700 South will not be constructed as part of this project. The project will: Widen I-15 from two to three lanes between Bluff Street (Exit 6) and St. George Blvd. (Exit 8) Replace structures and raise I-15 at 100 South and 700 South Construct new structures over 400 East and 900 South to establish local street connections under I-15 Coordinate the realignment of several utilities and the installation of new utilities Improve various drainage facilities along and under I-15 ---UDOT--- MEDIA CONTACT: Kevin Kitchen UDOT Region 4 Communications Manager
Notice of Special Accommodations (ADA)
NA
Notice of Electronic or Telephone Participation
NA
Other Information
Comments must be submitted or postmarked by July 7, 2025. All comments submitted will be evaluated and considered by UDOT. The environmental document will be available at udotinput.utah.gov/I15stgeorge on June 18. Paper copies are available at the St. George City Library (88 W 100 S, St. George, UT), St. George City Office (175 E 200 N, St. George, UT), and UDOT Region 4 Office (5340 S 5300 W, Hurricane, UT 84737).

Meeting Information

Meeting Location
929 S 100 E
Dixie Middle School
St. George , UT 84770
Show in Apple Maps Show in Google Maps
Contact Name
Utah Department of Transportation
Contact Email
contactudot@utah.gov
Contact Phone
(801)965-4000

Notice Posting Details

Notice Posted On
June 11, 2025 01:21 PM
Notice Last Edited On
June 11, 2025 01:29 PM
Deadline Date
July 7, 2025 04:00 PM