The Utah Department of Transportation (UDOT) has released a preliminary design and draft environmental reevaluation for the Interstate 15 St. George Boulevard to Bluff Street project that will be presented at a public meeting and open to public comment.
UDOT is hosting a public meeting to present the findings of the reevaluation, provide an opportunity to submit written or verbal comments, display the preliminary design of the project, and answer questions from the public.
In-person Public Hearing (open house format):
Wednesday, June 25, from 5 to 7 p.m.
Dixie Middle School, 929 S 100 E, St. George, Utah 84770.
The in-person meeting is an open-house format with no formal presentation provided. Materials displayed at the meeting will be made available the next day at udotinput.utah.gov/I15stgeorge
A public comment period is open from June 18 through July 7, 2025. The environmental document will be available at udotinput.utah.gov/I15stgeorge on June 18. Paper copies are available at the St. George City Library (88 W 100 S, St. George, UT), St. George City Office (175 E 200 N, St. George, UT), and UDOT Region 4 Office (5340 S 5300 W, Hurricane, UT 84737).
Comments are accepted:
In-person at the Public Hearing on June 25, via written comment form or a court reporter
Online at udotinput.utah.gov/I15stgeorge
By email to I15StGeorge@utah.gov
By mail to the I-15 St. George Improved Project Team, c/o Avenue Consultants (136 E Riverside Drive, Suite 100, St. George, UT 84790)
Comments must be submitted or postmarked by July 7, 2025. All comments submitted will be evaluated and considered by UDOT.
The reevaluation of the I-15 South EA and the I-15 St. George Improved EA is being completed to incorporate the addition of the new overpasses and local connections at 400 East and 900 South that were not part of the original environmental documents.
The reevaluation process began in fall 2024 and is scheduled for completion by summer 2025, with construction of the project planned to begin in summer 2026. Environmental documents are process-driven, so the schedule is approximate and subject to change.
A new I-15 interchange at 700 South will not be constructed as part of this project.
The project will:
Widen I-15 from two to three lanes between Bluff Street (Exit 6) and St. George Blvd. (Exit 8)
Replace structures and raise I-15 at 100 South and 700 South
Construct new structures over 400 East and 900 South to establish local street connections under I-15
Coordinate the realignment of several utilities and the installation of new utilities
Improve various drainage facilities along and under I-15
---UDOT---
MEDIA CONTACT:
Kevin Kitchen
UDOT Region 4 Communications Manager
Notice of Special Accommodations (ADA)
NOTICE OF SPECIAL ACCOMMODATION DURING PUBLIC MEETINGS. Any individual needing special accommodations (including auxiliary communicative aids and services) during this meeting should contact the project team at least 72 hours in advance at 435-280-2266 or I15StGeorge@utah.gov.
Para información en español, llame al 435-280-2266 o envíanos un correo electrónico a I15StGeorge@utah.gov.
The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being or have been carried out by UDOT pursuant to 23 USC 327 and a Memorandum of Understanding dated May 26, 2022, and executed by the Federal Highway Administration and UDOT.
Notice of Electronic or Telephone Participation
NA
Other Information
Comments must be submitted or postmarked by July 7, 2025. All comments submitted will be evaluated and considered by UDOT.
The environmental document will be available at udotinput.utah.gov/I15stgeorge on June 18. Paper copies are available at the St. George City Library (88 W 100 S, St. George, UT), St. George City Office (175 E 200 N, St. George, UT), and UDOT Region 4 Office (5340 S 5300 W, Hurricane, UT 84737).