TOOELE CITY CORPORATION ADVERTISEMENT
ADVERTISEMENT FOR BIDS
Separate sealed Bids for the completion of the
TOOELE WRF 2026 UPGRADES
Project will be received by the owner at:
RECORDERS OFFICE - ROOM 227
TOOELE CITY HALL
90 NORTH MAIN
TOOELE, UTAH 84074
At prevailing local time until Thursday, August 13rd, 2026 at 2:00 PM MDT, at which time bids will
be opened and read publicly in Suite 224. Digital bids will not be accepted.
The Tooele WRF 2026 Upgrades (Hereafter referred to as 'Project') consists of construction of
improvements to the existing solar drying processes at the Tooele WRF, including retrofit of the
solar dryer greenhouse, demolition, new heated floors, site work, yard piping, electrical and
instrumentation, HVAC and plumbing, and all other equipment and infrastructure to make the
upgraded facilities complete and operational; construction of a new boiler room at the existing WRF,
including installation of a new pre-engineered metal building to also include electrical, HVAC and
plumbing, and all other equipment and infrastructure to make the boiler room facility complete and
operational; new ultraviolet (UV) disinfection system to be retrofit into the existing Channel #2,
including electrical and instrumentation, demolition, and all other equipment and infrastructure
required to make the upgraded facilities complete and operational. The integration of SCADA will
be by Owner under a separate contract. The HUBER solar dryer turners and Trojan UV disinfection
system equipment have been pre-procured by the Owner and will be assigned to the General
Contractor for installation and startup.
The Project shall be substantially completed by 18 months from Notice to Proceed.
The CONTRACT DOCUMENTS will be available Thursday, July 9th, 2026.
Bid documents will be posted by Tooele City. Please contact Laura at laurab@tooelecity.gov for an
electronic copy of the bid documents.
No printed copies will be provided. The costs to prepare Bids as described in the Bidding Documents
are the sole responsibility of the Bidder. For questions, contact Lauren Schmidt, J-U-B Engineers:
801-664-2489, lschmidt@jub.com, cc ahobson@jub.com. Submit all questions using RFI form
included in bidset package.
A mandatory pre-bid meeting will be held on Thursday, July 23rd, 2026 from 1:00PM - 3:00PM MDT
at the Tooele WRF. Meeting details will be emailed to plan holders. Representatives, Owner, and
Engineer will be present at the pre-bid conference to discuss the Project.
The last day for questions shall be Thursday, July 28th, 2026. All questions will be answered via
addendum. Only those who have their name on the plan holders list will receive addenda.
A five percent (5%) bid bond is required. The Owner reserves the right to waive any informality. Per
C-200 Instructions for Bidders, Owner reserves the right to reject any or all bids; to accept or reject
the whole or any part of any bid; or to waive any information or technicality in any bid in the best
interest of the City. Only bids giving a firm quotation properly signed will be accepted.
Schedule Recap:
Item Deadline: Date/Time or Days
Substantial Completion 18 months from Notice to Proceed
Contract Documents First Available Thursday, July 9th, 2026
Prebid Conference Thursday, July 23rd, 2026 at 1:00pm local time
Last Day for Questions Thursday, August 6th, 2026
Bids Due Thursday, August 13th, 2026 at 2pm local time
Notice of Special Accommodations (ADA)
Pursuant to the Americans with Disabilities Act, Individuals Needing Special Accommodations Should Notify Shilo Baker, Tooele City Recorder, at 435-843-2111 or Shilob@tooelecity.gov, Prior to the Bid Opening.