Furnish all labor, equipment and materials required to remove and replace asphalt pavement, install concrete curb, gutter, and sidewalk, install retaining wall, and install storm drain catch basins, piping, and subsurface retention system. All work to be done according to plans, Payson City, and APWA Standards and Specifications.
Notice of Special Accommodations (ADA)
In accordance with the Americans with Disabilities Act, Payson City will make reasonable accommodations to participate. Requests for assistance can be made by calling 465-5205 at least 48 hours in advance.
Notice of Electronic or Telephone Participation
N/A
Other Information
Electronic bids submitted via the U3P website are due on or before the designated time. Late bids will not be accepted.