A Secure Online Service from Utah.gov

Utah.gov

Public Notice Website

Division of Archives and Records Service

DIVISION OF WATER QUALITY UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE TO ISSUE A SECTION 401 WATER QUATLITY CERTIFICATION

Subscribe to Public Body

General Information

Government Type
State Agency
Entity
Department of Environmental Quality
Public Body
Division of Water Quality

Notice Information

Add Notice to Calendar

Notice Title
DIVISION OF WATER QUALITY UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE TO ISSUE A SECTION 401 WATER QUATLITY CERTIFICATION
Notice Tags
Water Quality
Notice Type(s)
Notice
Event Start Date & Time
May 31, 2023 08:00 AM
Event End Date & Time
June 14, 2023 05:00 PM
Description/Agenda
May 31, 2023 DIVISION OF WATER QUALITY UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE TO ISSUE A SECTION 401 WATER QUATLITY CERTIFICATION PURPOSE OF PUBLIC NOTICE The purpose of this public notice is to declare the State of Utah's intention to issue a Section 401Water Quality Certification with Conditions under the authority of the Federal Clean Water Act (33U.S.C. ยง 1341), and consistent with the Utah Water Quality Act, Title 19, Chapter 5, Utah Code and Utah Administrative Code R317-15. PERMIT INFORMATION PERMITTEE NAME: Symphony Development, Inc. MAILING ADDRESS: 111 South Frontage Road Centerville, Utah 84014 PROJECT LOCATION: The proposed project will be located at 1500 South 50 West Farmington City, Utah. The approximate project location is 40.955203 and -111.887677 degrees. DWQ CERTIFICATION NO.: DWQ-2023-006315 WATERCOURSES: The project will permanently impact 0.42 acres of palustrine emergent wet meadow wetlands and 0.08 acres of emergent wetlands in the Weber River Watershed. BACKGROUND Symphony Development, Inc. (Project Proponent) proposes to complete East Ridge Estates, Phase 4 (Project) of the Farmington City-approved master plan for single-family homes residential subdivision. The purpose of the proposed Project is to develop additional single-family homes within an existing residential subdivision. The Project Proponent indicated that the proposed Project is needed to meet Farmington City's demand for additional single-family homes and improve local and emergency access to the existing subdivision. The Project Proponent proposes the construction of nine residential building lots, the extension of 1500 South Street and 50 West Street, and an ingress/egress of the site to provide access to the Phase 4 project area. The proposed Project will include the installation of utility lines, gas lines, electrical power systems, stormwater piping, land drains, culinary water, and secondary water, and sewers for the development of the subdivision. The area proposed for the Project is approximately 8.44 acres. 3.38 acres of the total project area will be disturbed by construction. The proponent proposes that 2,728 cubic yards of clean fill material will be used to fill 0.42 acres of palustrine emergent wet meadow wetlands and 0.08 acres of excavated storm ditch containing palustrine emergent wetlands. The fill would result in a permanent loss of 0.5 acres of Waters of the U.S. (WOTUS). No streams or channels are on or adjacent to the proposed Project area. The Project Proponent stated the Project was designed to minimize the impacts of the development. A total of 5.06 acres containing 2.48 acres of wetlands of the proposed Project area will be left undisturbed as green space. The Project Proponent plans to utilize Best Management Practices to minimize the Project impacts. Silt fencing will be installed around the perimeter of portions of the project area boundary to protect surrounding wetlands and aquatic resources. To compensate for the WOTUS loss, the Project Proponent proposes to acquire 0.75 acres of emergent wetland mitigation credits from Machine Lake Mitigation Bank. This proposed mitigation will equate to a 1:1.5 mitigation compensation ratio. PUBLIC COMMENTS Public comments are invited any time prior to the deadline of the close of business on June 14, 2023. Written public comments can be submitted to: Linsey Shafer, General Permitting Section, Utah Division of Water Quality, PO Box 144870, Salt Lake City, Utah 84114-4870 or by email at: wqcomments@utah.gov. After considering public comments the Utah Division of Water Quality may execute the Certification issuance, revise it or abandon it. The Certification is available for public review under https://deq.utah.gov/water-quality/water-quality-public-notices. A copy may be obtained by contacting Linsey Shafer (385) 405-4158. DWQ-2023-006293
Notice of Special Accommodations (ADA)
In compliance with the Americans with Disabilities Act, individuals needing special accommodations (including auxiliary communicative aids and services) during this meeting should notify Emily Canton at 801-536-4342.
Notice of Electronic or Telephone Participation
NA

Meeting Information

Meeting Location
195 N 1950 W
Division of Water Quality
UT - Utah, UT 84116
Show in Apple Maps Show in Google Maps
Contact Name
Emily Canton
Contact Email
ercanton@utah.gov
Contact Phone
(801)536-4342

Notice Posting Details

Notice Posted On
May 30, 2023 01:51 PM
Notice Last Edited On
May 30, 2023 01:51 PM

Download Attachments

File Name Category Date Added
DWQ-2023-006293 Public Notice.pdf Other 2023/05/30 01:50 PM
DWQ-2023-006315 Draft Permit.pdf Other 2023/05/30 01:51 PM


Subscribe

Subscribe by Email

Subscription options will send you alerts regarding future notices posted by this Body.