DIVISION OF WATER QUALITY UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE OF INTENT TO RENEW A UPDES PERMIT- UDOT MS4 UPDES Permit
Notice Type(s)
Notice
Event Start Date & Time
July 23, 2026 08:00 AM
Event End Date & Time
August 24, 2026 05:00 PM
Description/Agenda
July 23, 2026
DIVISION OF WATER QUALITY
UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY
PUBLIC NOTICE OF INTENT TO RENEW A UPDES PERMIT
PURPOSE OF PUBLIC NOTICE
The purpose of this public notice is to declare the Director of the Division of Water Quality's intention to
renew a Utah Pollutant Discharge Elimination System ('UPDES') Permit under the authority of the Utah
Water Quality Act, Utah Code § 19-5-106(2)(g). The draft Permit and the Fact Sheet (collectively, the draft
Permit documents) are available for review and comment.
PERMIT INFORMATION
PERMIT NAME: Utah Department of Transportation ('UDOT') Municipal Separate Storm Sewer System ('MS4') UPDES Permit
PERMIT NO: UTS000003
This Permit renews the previous UDOT MS4 Permit, UTS000003, originally issued August 31, 2021, and modified on August 16, 2023 and March 12, 2025. This Permit covers new or existing discharges composed entirely of stormwater from the Permittee's MS4, which are required by the State to obtain permit coverage.
The Permittee's MS4 area covers all portions of the MS4 including all state and interstate roadways and the rights-of-ways associated with them, UDOT-owned properties, and UDOT-owned or operated facilities that discharge to waters of the State.
BACKGROUND
The Federal Clean Water Act requires that storm water discharges from certain types of facilities be authorized under stormwater discharge permits. See 40 C.F.R. § 122.26. The goal of the stormwater permits program is to reduce the amount of pollutants entering streams, lakes and rivers as a result of runoff from residential, commercial and industrial areas. The original 1990 regulations ('Phase I') covered publicly owned storm sewer systems for municipalities with a population over 100,000 people. The regulations were expanded in 1999 to also include smaller municipalities. This expansion of the program to include Small MS4s is referred to as Phase II.
The Phase II rule also included non-traditional MS4s such as public universities, departments of transportation, hospitals and prisons. This Permit covers new or existing discharges composed entirely of stormwater statewide. UDOT was originally designated as a co-permittee within the Phase I area of Salt Lake County. In 2003, UDOT was separated into its own individual statewide MS4 permit. UDOT is divided into four geographical areas called regions; a brief description of each region is below:
Region 1: Covers the northern part of the state from North Salt Lake northward, including the following counties: Davis, Weber, Morgan, Box Elder, Cache and Rich. Region One headquarters is located in Ogden.
Region 2: Includes densely populated urban areas along the Wasatch Front, and sparsely populated rural and desert lands, including Salt Lake County, Summit County and Tooele County. Region two headquarters is located in Salt Lake City.
Region 3: Includes Utah, Juab, Wasatch, Duchesne, Uintah and Daggett Counties. Region three headquarters is located in Orem.
Region 4: Includes Millard, Beaver, Iron Washington, Carbon, Emery, Grand, San Juan, Sanpete, Sevier, Wayne, Piute, Garfield and Kane counties. Region four headquarters is located in Richfield.
In 1987, the U.S. Environmental Protection Agency granted primacy to the state of Utah to implement the National Pollutant Discharge Elimination System program. Utah's program is known as the UPDES Program. In Utah, stormwater discharge permits are issued by the Director of the Division of Water Quality. The Permit requires UDOT to reduce the discharge of pollutants to the maximum extent practicable, and to meet water quality standards through the development and implementation of a Storm Water Management Program.
PUBLIC COMMENTS
Pursuant to Utah Admin. Code R317-8-6(6.6), any interested person may submit written comments on the draft permit documents and may request a public hearing if no hearing has already been scheduled. A request for a public hearing shall be in writing and shall state the nature of the issues proposed to be raised
in the hearing. All comments will be considered in making the final decision and shall be answered as
provided in Utah Admin. Code R317-8-6(6.12).
Commenters have an affirmative obligation to raise all reasonably ascertainable issues and submit all
reasonably available arguments and factual grounds supporting their position, including all supporting
material. Supporting material must be included in full and may not be incorporated by reference, unless
the material is already part of the administrative record.
Public comments are invited any time prior to the deadline of the close of business on August 24, 2026.
Written public comments can be submitted to: Kelsee York, Utah Division of Water Quality, PO Box
144870, Salt Lake City, Utah 84114-4870 or by email at: wqcomments@utah.gov.
After considering public comments, the Director of the Division of Water Quality will issue a final Permit
decision. The draft Permit documents are available for public review under 'Public Participation' at
https://deq.utah.gov/dwq/wq-public-notices. Additionally, if internet access is not available, a copy may be obtained by calling the Division of Water Quality at (801) 536-4300.
DWQ-2026-004512
Notice of Special Accommodations (ADA)
In compliance with the Americans with Disabilities Act, individuals needing special accommodations (including auxiliary communicative aids and services) during this meeting should notify Emily Canton at 801-536-4342.