Request for Proposal - Expansion of Pressurized Irrigation Pond 8 Project
Notice Tags
Other
Notice Type(s)
Notice
Event Start Date & Time
May 14, 2026 06:00 PM
Event Deadline Date & Time
06/02/26 01:00 PM
Description/Agenda
REQUEST FOR PROPOSAL
Expansion of Pressurized Irrigation Pond 8 Project
Through this Request for Proposals (RFP), the City of Saratoga Springs (hereinafter the 'City') is soliciting competitive sealed proposals from pre-qualified Engineering firms (hereinafter the Engineer) to provide designs, specifications, bidding assistance and construction services for expansion of existing pressurized irrigation Pond 8- Evans Lane. The pre-qualified firms are Hansen, Allen & Luce, Bowen Collins & Associates and AE2S.
The project is to expand the existing Pond 8 near Evans Lane from a capacity of 17 acre-feet (ac-ft) to a capacity of 29 ac-ft. Additionally, improvements to the spillway that drains into Evans Lane are required. The Utah Division of Water Rights, Dam Safety Section has classified the existing Pond 8 - Evans Lane as high hazard. Permitting the expansion design and construction through Dam Safety is required.
The following timetable has been established for this project. LATE PROPOSALS WILL NOT BE ACCEPTED.
- Pre-Proposal Meeting (Mandatory) Thursday, May 20th 4:00 pm at Public Works 213 N 900 E, Saratoga Springs
- Questions Due through U3P website: May 28th 1:00 pm
- Proposals Due: June 2nd 1:00 pm
- Proposal Opening: June 2nd 1:30 pm
- Potential Award of Contract: June 16th
All proposals shall be submitted in PDF format through the U3P website and by the due date indicated above.
U3P
This Advertisement is issued by:
OWNER: City of Saratoga Springs
By: Jeremy Lapin
Title: Public Works Director
Notice of Special Accommodations (ADA)
In compliance with the Americans with Disabilities Act, individuals needing special accommodations (including auxiliary communicative aids and services) during this meeting should notify the City Recorder at 766-9793 at least one day prior to the meeting.