This project includes removal of interior mortar lining of
fifteen locations on the Jordan Aqueduct Reach 1, a 78-inch weld steel, mortar lined and
coated pipe, which were identified to have wall loss from a 2020 condition assessment.
JVWCD's consultant will verify wall loss in these locations using nondestructive methods.
If wall loss is occurring on the interior of the pipe, an interior patch will be placed and the
interior mortar coating will be repaired. If wall loss is measured and not found on the
interior of the pipe, the exterior of the pipe will be exposed, corrosion treated, an exterior
patch will be placed and the interior and exterior linings will be repaired. Three exterior
joints on the Jordan Aqueduct Reach 1 will be exposed and inspected. A section of the
Jordan Aqueduct Reach 4 will also be exposed to investigate a current drop if the
aqueduct's cathodic protection current.
Notice of Special Accommodations (ADA)
In compliance with the Americans with Disabilities Act, individuals needing special accommodations (including auxiliary communicative aids and services) during this meeting should notify Dave Martin at 801-565-4300.