Herriman City Miller Crossing Pod 1 - Trench Repair: The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. The Work generally includes, but is not limited to, the following: Trench repair for Sewer (~1380 LF), Sewer Laterals (~333 LF), Water (~87 LF), Fire Hydrant (1 EA) and Fire Hydrant Lateral (~13 LF) in Miller Crossing Pod 1 on Grain Mill Road and Bed Stone Lane. Additional 1.5 Inch Mill and Overlay of Grain Mill Road and Bedstone Lane (43,885 SF) and associated work. Bid Documents can be found by visiting the Utah Public Procurement Place at utah.bonfirehub.com. A Pre-Bid Meeting will be held at City Hall on August 4th at 3:00 PM, and the Bid Opening will occur August 12th at 3:00 PM.