DIVISION OF WATER QUALITY UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE OF INTENT TO MODIFY A UPDES PERMIT
Notice Type(s)
Notice
Event Start Date & Time
July 10, 2025 04:53 PM
Event End Date & Time
August 9, 2025 05:00 PM
Description/Agenda
DIVISION OF WATER QUALITY
UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY
PUBLIC NOTICE OF INTENT TO MODIFY A UPDES PERMIT
PURPOSE OF PUBLIC NOTICE
The purpose of this public notice is to declare the Director of the Division of Water Quality's intention to modify a Utah Pollutant Discharge Elimination System (UPDES) Permit under the authority of the Utah Water Quality Act, Utah Code ยง 19-5-106(2)(g). The draft Permit and the Fact Sheet (collectively, the draft Permit documents) are available for review and comment.
PERMIT INFORMATION
PERMITTEE NAME: PacifiCorp
FACILITY NAME: Lake Side Power Plant
MAILING ADDRESS: 1825 North Pioneer Lane, Vineyard, UT 84042
TELEPHONE NUMBER: 801-796-1835
FACILITY LOCATION: 1825 North Pioneer Lane, Vineyard, UT 84042
UPDES PERMIT NO.: UT0025623
PERMITTED OUTFALLS: 002
OUTFALL LOCATION: Latitude 40 19'54.55' and Longitude 111 45' 47.65'
RECEIVING WATER: Lindon Hollow Creek
BACKGROUND
Lake Side Power Plant is located in Vineyard, Utah. The Facility's Standard Industrial Classification (SIC) code is 4911, and the North American Industry Classification System (NAICS) code is 221111 for Steam Electric Power Generation. The Facility has an electric output capacity of 1204 megawatts. The Facility utilizes ground water in the cooling cycle and discharges it to Lindon Hollow Creek. The purpose of the modification is to change the type of sample collection required for some parameters from composite, back to grab, consistent with the previous permit. See the Permit and Fact Sheet for more information
PUBLIC COMMENTS
Pursuant to Utah Admin. Code R317-8-6(6.6), any interested person may submit written comments on the draft permit documents and may request a public hearing if no hearing has already been scheduled. A request for a public hearing shall be in writing and shall state the nature of the issues proposed to be raised in the hearing. All comments will be considered in making the final decision and shall be answered as provided in Utah Admin. Code R317-8-6(6.12).
Commenters have an affirmative obligation to raise all reasonably ascertainable issues and submit all reasonably available arguments and factual grounds supporting their position, including all supporting material. Supporting material must be included in full and may not be incorporated by reference, unless the material is already part of the administrative record.
Public comments are invited any time prior to the deadline of the close of business on August 9, 2025. Written public comments can be submitted to: Daniel Griffin, UPDES Individual Permits Section, Utah Division of Water Quality, PO Box 144870, Salt Lake City, Utah 84114-4870 or by email at: dgriffin@utah.gov.
After considering public comments, the Director of the Division of Water Quality will issue a final Permit decision. The draft Permit documents are available for public review under 'Public Participation' at www.waterquality.utah.gov/. Additionally, If internet access is not available, a copy may be obtained by calling Daniel Griffin at (801) 536-4387.