DIVISION OF WATER QUALITY UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE TO ISSUE A SECTION 401 WATER QUALITY CERTIFICATION
Notice Type(s)
Notice
Event Start Date & Time
October 30, 2026 04:30 PM
Event End Date & Time
November 16, 2026 05:00 PM
Description/Agenda
PURPOSE OF PUBLIC NOTICE
The purpose of this public notice is to declare the State of Utah's intention to issue a Section 401Water Quality Certification with Conditions under the authority of the Federal Clean Water Act (33U.S.C. § 1341), and consistent with the Utah Water Quality Act, Title 19, Chapter 5, Utah Code and Utah Administrative Code R317-15.
PERMIT INFORMATION
PERMITTEE NAME: Wasatch County
MAILING ADDRESS: 35 S 500 E, Heber City, UT 84032
PROJECT LOCATION: 2700 W Webster Ln, Midway / Charleston, Wasatch County, Utah
Latitude: 40.485847° N, Longitude: -111.457686° W
CERTIFICATION NO.: DWQ-2026-06001
WATERCOURSES: PEM Wetlands in the Provo Watershed
BACKGROUND
Wasatch County (Project Proponent) proposes to construct Heber Valley Railroad Trail Phase B (Proposed Project). The Proposed Project aims to improve public safety and recreational access by constructing a dedicated multi-use trail parallel to the existing railroad tracks in Wasatch County, Utah. This 2.2-mile paved trail, running between SR-113 and West 1200 South, addresses the current safety risks posed by recreationalists using the railroad tracks as an informal path. The project will include a 10-foot-wide asphalt trail, two prefabricated steel pedestrian bridges over Snake Creek and the Provo River, and necessary grading and drainage improvements, with construction planned from March to October 2027. The Proposed Project will permanently impact approximately 0.60 acres of wetlands and require minimal tree and shrub removal; it is designed to avoid filling open water bodies and active stream channels and to minimize disruption to local wildlife and habitats. The Proposed Project was designed to minimize impacts, including aligning the trail close to the railroad to limit new disturbance, using retaining walls and clear-span bridges, restricting vegetation removal to outside bird nesting season or with biologist approval, and implementing Best Management Practices for erosion, sediment, and invasive species control. Additionally, the Project Proponent proposes to construct a 4-acre wetland mitigation site to fully compensate for the impacted wetlands, restore local hydrology, and enhance wildlife habitat with native plantings.
PUBLIC COMMENTS
Public comments are invited any time prior to the deadline of the close of business on November 16, 2026.[LS2.1] Written public comments can be submitted to: Linsey Shafer, General Permitting Section, Utah Division of Water Quality, PO Box 144870, Salt Lake City, Utah 84114-4870 or by email at: wqcomments@utah.gov. After considering public comments, the Utah Division of Water Quality may execute the Certification issuance, revise it, or abandon it. The Certification is available for public review under https://deq.utah.gov/public-notices-archive/water-quality-public-notices. A copy may be obtained by contacting the Utah Division of Water Quality at (801) 536-4300.
Notice of Special Accommodations (ADA)
In compliance with the Americans with Disabilities Act, individuals needing special accommodations (including auxiliary communicative aids and services) during this meeting should notify Emily Canton at 801-536-4342.